Agriboard Development Co

Agriboard Development Co

  • 100 Industrial Park
  • Electra, Texas
  • 76360

Website Links

Description

Chris Our company has about 15 years experience in pre-fab panel construction and I have to say that your system is by far the most superior we have installed. So far we have built four Wachovia banks with Agriboard and I am very impressed with the panel layout and the ease of installation. The last bank we installed was the larger 4500 sq. ft. design. The first day we layout, plate, and unload trucks. Then it takes two and one half days to install the panels, with another day to finish the hardware, this is with a six man crew.

I would like to take this opportunity to express my appreciation for the quality and installation of the Agriboard system on the Wachovia Bank Casa Linda project. Being that this was my first experience with the system, I was impressed with the design and manufacturing of the panels along with their structural integrity. Equally impressive is how the panels are designed for installation. With my lack of experience in the system I was anticipating some difficulty making panel connections. However, the design and the quality in manufacturing made installation seem simple.

Companies nearby