Website Links
Description
Phase I includes Conceptual/Schematic design and Design Development. These are stages where all of the necessary information is gathered and general architectural concepts are developed. Once the final design has been approved, detailed drawings and other data shall be prepared which relate to the building(s) layout, size, and appearance. All of these factors are necessary for the "Value Engineering" (Approximate Construction Estimation Cost) and the approval of the project by the City Planning Department. This phase includes the services outlined below: (As Applicable). -Survey of existing conditions and confirmation of any existing structures(s). -Confirmation of all State, County, and City code requirements. -Preparation of schematic design concepts including site plan, floor plans, exterior elevations, and design building sections. -Preparation and review of Schematic Site Plan illustrating building location(s), driveways, decks, pools, Jacuzzi, landscaping, etc. -Preparation of all drawings and documents required for city planning review. Phase II is the creation of the "Construction Documents." The "Construction Documents" are based upon the approved design considerations that have been discussed between the Client, Britt
Fact sheet
Company contacts
- David Britt
- Owner
Companies nearby
-
Interior Design Source
Distance: 0.1 Mi114 Royce Street
95030 Los Gatos -
Voris John Industrial Engineering
Distance: 0.0 Mi59 North Santa Cruz Avenue
95030 Los Gatos -
Austin Design
Distance: 0.1 Mi114 Royce St
95030 Los Gatos -
Cavemasters Wine Asset Management
Distance: 0.1 Mi50 University Ave
95030 Los Gatos -
Gabrielle's Bridal Boutique
Distance: 0.1 Mi104 University Ave
95030 Los Gatos