Number of employees
10-14
A remote site in the hills where this type of job is typically necessary.The wall is complete, with only scaffolding remaining to be removed, the cap to be placed and the drainage system to be constructed. The job was challenging in that there was limited space for heavy equipment to move onto and around the job site; and for staging materials and dirt. Trenches are dug to provide for drain lines from the wall above.