We get questions on stacking problems and have set this demo up to help answer some of those questions. 1 -- Be sure to be lined up straight with wagon and tractor. 2 -. You need something to hold the first load up and some form of poles or building will do or hand stack some bales behind the first load. 3 --Brace up the load after unloaded and before pushing off .(see "A" red pole or pipe), after it has been set down move poles before pushing off. 4. - Must have over head room for unloading, check the spec page for height needed for each wagon. This can be a one man operation with this help. I have seen 1200 to 1500 bales stacked in one day with out too much trouble. If the unloading area ground has a slight slope to the back it will help however this is not always possible. Ken Stallbaumer Please send to provide feedback about this page.