Vermont Built, Inc

Vermont Built, Inc

  • 65 Creek Farm Plz Ste 6
  • Colchester, Vermont
  • 05446-7267

Website Links

Description

Because the process of building a new home starts long before construction begins, Vermont Built, Incorporated considers it essential to become involved in the process when the potential buyer first begins to think about building a new home. We make available, at no charge and no commitment, any information that will help the potential buyer make informed decisions including lot selection , home design , and financing . The accompanying photographs provide some insight into the important steps in the construction of a Barden home. Here the photograph shows the clearing that has been made in the existing tree cover. This unimproved lot required substantial planning in the layout of the 400 foot driveway and the placement of the home to meet the privacy and aesthetic expectations of the buyer.Water drainage systems, seasonal access, and snow removal are basic components in placing the new driveway depicted in this photo. To insure proper water drainage on a lot with elevation changes, careful consideration is given to the grade surrounding the home. In this instance, Paul Truax, holding grading rod, and the excavation contractor discuss site requirements for a walkout basement door. One of the challenges in digging the cellar hole is holding the bottom of the excavation close to level. Another is keeping the predetermined footprint of the home in the same place as was staked before the digging began. A foundation properly constructed with the necessary drains around the footings helps to insure not only a dry basement, but also the proper beginning of a well constructed home. The home starts with the building of the first floor deck in preparation for the arrival and placement of the pre-constructed partitions and trusses. Most two-story homes arrive in two loads, the first containing partitions for the first and second floor deck material. The second load includes partitions for the second floor, trusses, roof sheathing, and other roofing material. The 70-foot long tractor-trailer has an attached crane which lifts each partition onto the deck, fitting it into the space for which it has been designed. Square and plumb are the words for the day as the two partitions that form the beginning corner for the first floor are lowered into place.Here we see the cable attached to a wall section as it is moved into place. Before each partition is moved, the deck is marked with chalk to insure proper placement. In this photo the trusses, looking much like a ribcage, are in place. The highest point of the home is lowered onto the spot that has been awaiting its arrival.

Products & services

Similar companies nearby