Number of employees
5-9
Our designs reflect our passion for our sensitivity to the environment, the problem at hand, and the needs of our clients.
Working with the University staff and FMG Engineering, Wyss Associates helped with the athletic program needs, and developed options for the renovation. In finalizing projected costs, Wyss Associates reviewed available materials, installation costs and long-term maintenance costs. The new program includes an 8 lane 400 meter track & field events and entrance walk. Working with FMG Engineering, the project team provided a complete topographic survey of existing conditions and specified all materials and details in preparation of the construction documents.