-
ALB Inc.
Distance: 394.1 Mi552 West 10TH Street
94565 Pittsburg -
Ed Zweigle Enterprises
Distance: 437.3 Mi140 Fallbrook Drive
89439 Verdi
Description
Tony Penna has been in the construction industry for over 32 years and most of that time was dedicated to masonry and concrete specifically in south Orange County. He has worked with many different forming systems through out his career. Beginning in 1998, he was offered to take a training course in Arxx Insulated Concrete Forms. Now with Fox Blocks as our flagship product, ICF systems proved to be a great product that inspired Tony, his father and brother to become acclaimed distributors and technicians of ICF in southern California.
Forming solutions has been in business for over 14 years and provides top quality ICF products. Joe Penna & Tony Penna started this business to fill a need of environmental concern, economical saving and education in energy conservation in Southern California.
Design, Engineer and Build New Construction with MAXIMUM SUSTAINABILITY, REDUCED WASTE and COST EFFICIENCY. We invite you to learn about Insulated Concrete Form (ICF)construction. This proven construction technique, used throughout Europe for over 50 years, offers many environmental benefits, including less construction waste, reduction of harmful emissions and prevention of mold, erosion and mildew along with many other extraordinary advantages.
The Arxx High Performance Wallsystem consists of interlocking, lightweight, expanded polystyrene forms. Designed to be an integral part of the wall, the forms remain in place after the concrete is poured. The insulating capacity of expanded polystyrene coupled with the structural integrity of reinforced concrete is a powerful combination -- it makes Arxx walls stronger, safer, quiter and more energy efficient. In test after test, Arxx walls meet or exceed standards set by building codes.
Step 4: Footing dowels and vertical rebar do two different tasks, the footing dowels are a shear members and the vertical rebar is a tension member. Because of this, a lap splice is not critical and not required in many areas. If you are required to provide a non contact lap splice, create 2ā tall rebar sleeves out of 1.5ā PVC pipe with a skill saw. Before stacking the forms place the sleeves over the vertical dowels protruding from the footing or slab.